By integrating a battery system, it will be possible to install ultra-fast charging stations almost anywhere and at significantly lower cost without civil engineering or mains connection.
According to E.ON and Volkswagen Group Components, the new technology paves the way for a larger number of ultra-fast charging points to be installed where they are needed. E.ON is seeing demand for this solution from municipal utilities and local authorities as well as from filling stations and service areas. In addition, the offer is tailored to the electrification of retail parking lots and logistics companies such as parcel services.